|
Nortel 922-111 Exam - BestSheet.com Free 922-111 Sample Questions:
1. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and dual ISP 1100 Signaling Servers is upgrading the system to release 6.0. CPPM Call Server cards from inventory are being re-configured as CPPM Signaling Server cards to replace the ISP 1100s during the upgrade. Which tasks must be completed to re-configure the CPPM card hardware into a Signaling Server?
A. Remove the on-board 1 GB Flash FMD.
B. Set the S5 switch to OFF Position.
C. Set the S5 switch to ON Position.
D. Remove the 40 GB Hard Drive FMD.
Answer: A
2. A customer with a Communication Server (CS) 1000E Rls. 5.5 with two IPMGs is upgrading their system to release 6.0. The upgraded system will have two IP Media Gateways. Which statement is true regarding DSP resources for the IP Media Gateways in the upgraded system?
A. DSP resources are no longer reqiured for inter-IPMG calls.
B. DSP resources are localized to a particular IPMG where the DSP resource is located.
C. DSP resources are considered system resources and are not localized to a particular chassis.
D. DSP High density and low density DSP resources can not be mixed.
Answer: B
3. A customer with a Communication Server (CS) 1000E at Rls. 5.5 with two IPMGs is upgrading the system to release 6.0. This upgrade includes a Media Gateway Controller card with high density and one low density DSP daughterboard. How many one way voice channels does this configuration provide?
A. 32
B. 64
C. 96
D. 128
Answer: D
4. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and dual CPPM Signaling Servers is upgrading their system to release 6.0. The update to the CPPM Signaling Server BIOS is completed and the hardware has been configured as a Signaling Server. While loading the Linux base you are asked to enter a Fully Qualified Domain Name (FQDN). From which two parts is the FQDN composed and in which order must they be configured?
A. first the host name and then the domain name
B. first the domain name and then the host name
C. first the server IP address and then the port number
D. first the server port number and then the IP address
Answer: A
5. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and redundant CPPM Standalone Signaling Servers is upgrading the system to release 6.0. What must be done to the Signaling Server card before the upgrade can be completed?
A. Add a security device to the card.
B. Add a 40 GB FMD (hard drive) to the card.
C. Upgrade the VxWorks software to Rls. 6.0.
D. Add 1 GB DDR SO-DIMM memory to the card.
Answer: D
6. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and dual CPPM Signaling Servers is upgrading their system to release 6.0. The system is part of an IP Peer Network that includes a NRS database. Which upgrade step is correct?
A. Use NRS Manager to download the NRS backup file to a compact flash.
B. Use Element Manager to download the Signaling Server backup file to a compact.
C. Use NRS Manager to download the NRS backup file to the local PC.
D. Use Element Manager to download the Signaling Server backup file to the local PC.
Answer: C |